Friends of Farm Pond, Oak Bluffs MA
 

Permits Granted for Restoration

Here is where we are posting copies of the different permits granted for the restoration of farm pond.

To date, the permits are for the removal of the caps on the second culvert. The removal date is scheduled for either October 13th or 15th, 2009 at low tide.

Farm Restoration Permits

  • Permits granted for opening second culvert
    This pdf file contains a number of the permits granted for the removal of the caps on the second culvert.
    Click here to download file/form

Copyright 2017 Friends of Farm Pond, all rights reserved.
Website design and CMS by goffgrafix.com.